Photovolatic systems:

Innitial international business expirience

Photovolatic systems:

Innitial international business expirience
  • 1990. Marine traffic lights for PLOVPUT – Split, Croatia
    1991. Implementation of our first OFF-GRID system for a small holiday cabin, 300 Wp, 200Ah/12V, 1,0 kW-AC
    1990. - 1991.
  • 1992. Export of PV panels from factory SOLARNE CELIJE – Split to Germany for different applications (over 1,0 MW)
    1992.
  • 1993. Soltech commences the productuion of own small applications in China
    1995. Start of solar thermal business
    1997. Hotel BOZAVA – Dugi Otok, solar thermal plant, 3502
    1993. - 1997.
  • 1999. Soltech builds the first large solar-pumping system in Croatia with 10 m3 of water/daily, the same as 1988. in Iraq – for a desalination plant on Eufrates and Tigris
    2000. Over 100 small off-grid and street illumination systems built
    1999. - 2000.
  • 2005. TELECOMUNICATION – OFF-GRID systems with solar and wind powe
    2008. Implementation of the first ON-GRID plant in Croatia, JUZNI JADRAN – 10 kWp
    2012. SOLAR-parking with over 5000 m2
    2005. - 2012.
Important references in Croatia

  • Soltech starts with the first large-scale PV plant in Croatia – 1,0 MW, Kanfanar
    2012.
  • 2013. We develop a 60,0 MWp plant in Croatia, Drnis area 2017. Solar plant 10 MWp Sinjski Obrovac, Croatia
    2013., 2017.

  • Soltech completes the first large-scale thin-film project in Croatia - 1,1 MW in Stankovci
    2015.

  • Peugeot servis Zagreb, Citroen servis Zagreb, TM Zagreb
    2016.
  • 2018. Tender for solar plant with 300MWp Iraq, area Karbala
    2019. 553 kWp Vargon, Rijeka (rooftop)
    2019. 460 kWp Spin Valis, Požega (rooftop)
    2019. 3MWp Stankovci, Croatia
    2018. - 2019.
  • SE Kanfanar (Istra), 1.0 MWp (ground)
    SE Vis (otok Vis), 3,6 MWp (ground)
    2020.
  • SE Klas (Mostar), 128 kWp (roof)
    SE Merkur (Mostar), 119 kWp (roof)
    SE Z. Vuković (Mostar), 119 kWp (roof)
    SE Automehanika (Zagreb), 5x 33 kWp (roof)
    SE Končar Institut (Zagreb), 27 kWp (roof)
    SE Senega (Dalmacija) 1.1 MWp (ground)
    2021.
  • SE Unikomerc u Zagrebu (3 locations) total 255 kWp (roof)
    SE Alfa (Zagreb) 41,25 kwp (roof)
    SE Oktal Pharm (Zagreb) 600 kWp (roof)
    SE Pevex prodajni centri u HR (12 locations) total 4.3 MWp - in process (roof)
    SE Kanfanar II, 1 MWp – in process (ground)
    2022.
  • SE Vargon (Kukuljanovo) 800 kWp – in process (roof)
    SE Lagermax (Luka) 485,44 kWp – in proces (roof)
    SE Kvantum (Zagreb) 227,7 kWp – in proces (roof)
    SE Strabag (Lomnica and Rijeka) 408 kWp – in process (roof)
    SE Sardina, Brač, 1MWp – designing (roof)
    SE Spectra Media (4 locations), 945 kWp – designing and later construction (roof)
    SE Petrokov (Zagreb i Pula) 395,45 kWp – designing and later construction (roof)
    2023.
  • SE Hotel Medena (Trogir), 347,6 kWp – designing and later construction (roof)
    SE Hotel Jadran (Trogir), 171,6 kWp – designing and later construction (roof)
    SE Brodotrogir (Trogir), 770 kWp – designing and later construction (roof)
    SE Oroslavje, 1 MWp - designing and later construction (ground)
    SE Otok Pag, 6,3 MWp – designing (ground)
    SE Sunčane livade, Bilogora, 300 MWp – designing and later construction (ground)
    SE Power solar, Stankovci, 3,7 MWp – designing and later construction (ground)
    SE Rankan, Stankovci, 6,7 MWp – designing and later construction (ground)
    2023.
  • In process of contracting severel projects with total power of over 5 MWp (roof)
    2023.

References for cogeneration systems:

2009. – 2012. Construction management of pellet production plant with 5 t/h output for MODERATOR d.o.o. and ORC-type biomass cogeneration for LIKA ENERGO EKO d.o.o. with 1 MWel output (Construction 2009 until 2012, operational since may 2012) (Financing: KFW/HBOR/RBA)

2014. – 2019. Handling of administrative procedures for issuing status of elegible energy producer from renewable sources:

  • PELET GRUPA Novska, ORC-type biomass cogeneration with 1 MWel output and pellet production of 6 t/h. (operational since may 2014) (EBRD/PBZ)
    2014.
  • SPIN VALIS INTERNACIONAL, ORC-type biomass cogeneration with 1,525 MWel output. (operational since june 2015) (RBA)
    2015.
  • PANA ENERGY Turopolje ORC-type biomass cogeneration with 1 MWel output. (operational since june 2015) (ZABA)
    2015.
  • VRBOVSKO EKO ENERGIJA, ORC-type biomass cogeneration with 1,9 MWel output. (operational since june 2015) (ZABA)
    2017.
  • MODERATOR Udbina, ORC-type biomass cogeneration with 350 kWel output. (RBA) Prosumer-model project
    2017.
  • KIRCEK ENERGY Ljubeščica, ORC-type biomass cogeneration with 0,7 MWel output. (operational since july 2018) (PBZ)
    2018.
  • BRANA Virovitica, Integrated gasification combined cycle type cogeneration with 0,495 MWel output with 70kW ORC cascade. (operational since october 2018) (KENT BANK)
    2018.
  • BRANA DAR, Daruvar, Integrated gasification combined cycle type cogeneration with 0,495 MWel output with 70kW ORC cascade. (operational since november 2018) (KENT BANK)
    2018.
  • ENERGIJA VOĆIN, Voćin, Integrated gasification combined cycle type cogeneration with 0,495 MWel output with 70kW ORC cascade. (operational since november 2018) (PBZ)
    2018.
  • ENERGIJA INVEST, Grubišno Polje, Integrated gasification combined cycle type cogeneration with 0,495 MWel output with 70kW ORC cascade. (operational since december 2018) (PBZ)
    2018.
  • BIOENERGANA BJELOVAR, Bjelovar, ORC-type biomass cogeneration with 1 MWel output. (operational since february 2019) (PBZ)