  • 1990. Marine traffic lights for PLOVPUT – Split, Croatia
    1991. We build first OFF-GRID system for small weekend house, 300 Wp, 200Ah/12V, 1,0 kW-AC
    1990. - 1991.
  • 1992. Export of PV panels from factory SOLARNE CELIJE – Split to Germany for different applications (over 1,0 MW)
    1992.
  • 1993. Soltech start produce our own small applications in Chine
    1995. We start with solar thermal business
    1997. Hotel BOZAVA – Dugi Otok, solar thermal plant 350 m2
    1993. - 1997.
  • 1999. Soltech build up first large solar-pumping system in Croatia with 10 m3 of water/daily, same as 1988. in Iraq – desalination of Eufrat and Tigris
    2000. We have behind us over 100 small OFF-GRID systems, street lights
    1999. - 2000.
  • 2005. TELECOMUNICATION – OFF-GRID systems with solar and wind power
    2008. We build first ON-GRID plant in Croatia, JUZNI JADRAN – 10 kWp.
    2012. SOLAR-parking over 5000 m2
    2005. - 2012.
Značajnije reference Hrvatskoj

  • Soltech start with first largest PV plant in Croatia – 1,0 MW, Kanfanar
    2012.
  • 2013. We development 60,0 MWp in Croatia area Drnis 2017. Solar plant 10 MWp Sinjski Obrovac, Croatia
    2013., 2017.

  • Soltech finish first large thin-film project in Croatia 1,1 MW in Stankovci
    2015.

  • Peugeot servis Zagreb, Citroen servis Zagreb, TM Zagreb
    2016.
  • 2018. Tender solar plant 300MWp Iraq, area Karbala
    2019. 553 kWp Vargon, Rijeka (krov)
    2019. 460 kWp Spin Valis, Požega (krov)
    2019. 3MWp Stankovci, Croatia
    2018. - 2019.
  • SE Kanfanar (Istra), 1.0 MWp (ground)
    SE Vis (otok Vis), 3,6 MWp (ground)
    2020.
  • SE Klas (Mostar), 128 kWp (roof)
    SE Merkur (Mostar), 119 kWp (roof)
    SE Z. Vuković (Mostar), 119 kWp (roof)
    SE Automehanika (Zagreb), 5x 33 kWp (roof)
    SE Končar Institut (Zagreb), 27 kWp (roof)
    SE Senega (Dalmacija) 1.1 MWp (ground)
    2021.
  • SE Unikomerc u Zagrebu (3 locations) total 255 kWp (roof)
    SE Alfa (Zagreb) 41,25 kwp (roof)
    SE Oktal Pharm (Zagreb) 600 kWp (roof)
    SE Pevex prodajni centri u HR (12 locations) total 4.3 MWp - in process (roof)
    SE Kanfanar II, 1 MWp – in process (ground)
    2022.
  • SE Vargon (Kukuljanovo) 800 kWp – in process (roof)
    SE Lagermax (Luka) 485,44 kWp – in proces (roof)
    SE Kvantum (Zagreb) 227,7 kWp – in proces (roof)
    SE Strabag (Lomnica and Rijeka) 408 kWp – in process (roof)
    SE Sardina, Brač, 1MWp – designing (roof)
    SE Spectra Media (4 locations), 945 kWp – designing and later construction (roof)
    SE Petrokov (Zagreb i Pula) 395,45 kWp – designing and later construction (roof)
    2023.
  • SE Hotel Medena (Trogir), 347,6 kWp – designing and later construction (roof)
    SE Hotel Jadran (Trogir), 171,6 kWp – designing and later construction (roof)
    SE Brodotrogir (Trogir), 770 kWp – designing and later construction (roof)
    SE Oroslavje, 1 MWp - designing and later construction (ground)
    SE Otok Pag, 6,3 MWp – designing (ground)
    SE Sunčane livade, Bilogora, 300 MWp – designing and later construction (ground)
    SE Power solar, Stankovci, 3,7 MWp – designing and later construction (ground)
    SE Rankan, Stankovci, 6,7 MWp – designing and later construction (ground)
    2023.
  • In process of contracting severel projects with total power of over 5 MWp (roof)
    2023.

Reference u kogeneracijskim sustavima:

2009. – 2012. Vođenje investicije izgradnje pogona peleta od 5 t/h MODERATOR d.o.o. i kogeneracije na biomasu tipa ORC,
LIKA ENERGO EKO d.o.o. od 1 MWel. (2009 do 2012), (trajni pogon svibanj 2012). (KFW/HBOR/RBA)

2014. – 2019. Vođenje administrativne procedure i ishođenje statusa povlaštenog proizvođača električne energije:

  • PELET GRUPA Novska, kogeneracije na biomasu tipa ORC snage 1 MWel i proizvodnja peleta 6 t/h. (trajni pogon - svibanj 2014.). (EBRD/PBZ)
    2014.
  • SPIN VALIS INTERNACIONAL, kogeneracije na biomasu tipa ORC snage 1,525 MWel (trajni pogon - lipanj 2015.). (RBA)
    2015.
  • PANA ENERGY Turopolje, kogeneracije na biomasu tipa ORC snage 1 MWel. (trajni pogon - lipanj 2015.). (ZABA)
    2015.
  • VRBOVSKO EKO ENERGIJA, kogeneracije na biomasu tipa ORC snage 1,9 MWel, (trajni pogon - rujan 2017.). (ZABA)
    2017.
  • MODERATOR Udbina, kogeneracije na biomasu tipa ORC snage 350 kW. (RBA) Projekt je izgrađen po sistemu „Kupac sa vlastitom proizvodnjom“
    2017.
  • KIRCEK ENERGY Ljubeščica, kogeneracije na biomasu tipa ORC snage 0,7 MWel. (trajni pogon - srpanj 2018.). (PBZ)
    2018.
  • BRANA Virovitica, kogeneracije na biomasu tipa uplinjavanje drveta snage 0,495 MWel. sa ORC kaskadom od 70 kW. (trajni pogon - listopad 2018.). (KENT BANKA)
    2018.
  • BRANA DAR, Daruvar, kogeneracije na biomasu tipa uplinjavanje drveta snage 0,495 MWel. sa ORC kaskadom od 70 kW. (trajni pogon - studeni 2018.). (KENT BANKA)
    2018.
  • ENERGIJA VOĆIN, Voćin, kogeneracije na biomasu tipa uplinjavanje drveta snage 0,495 MWel. sa ORC kaskadom od 70 kW. (trajni pogon - studeni 2018.). (PBZ)
    2018.
  • ENERGIJA INVEST, Grubišno Polje, kogeneracije na biomasu tipa uplinjavanje drveta snage 0,495 MWel. sa ORC kaskadom od 70 kW. (trajni pogon - prosinac 2018.). (PBZ)
    2018.
  • BIOENERGANA BJELOVAR, Bjelovar, kogeneracije na biomasu tipa ORC snage 1 MWel. (trajni pogon - veljača 2019.). (PBZ)
    2019.